Files
Claude-Code-Monitor/plugins/ccam-cost-guard/commands/forecast.md
T
nntrivi2001 57dc91585d feat: Claude Code Monitor — lanes, pipelines and a merged workspace
Internal SmartGift build of a Claude Code monitoring dashboard.

Lanes: a durable unit of parallel agent work, one per working directory,
tracked across session restarts. Managed lanes are git worktrees the
dashboard provisions and can reset or remove behind a three-check destroy
guard and a counted preflight; adopted lanes are directories you already
own and are never destroyable.

Pipelines: a lane moves through pipeline stages. A stage the agent declares
with evidence renders green; a stage inferred from the tool-event stream
renders dashed amber and never counts as done. Detection is forward-only
within a 30-minute window, and never writes the declared stage.

Workspace: one page at /run with a lane grid, the selected lane's pipeline,
and a full Claude console behind a disclosure.
2026-07-30 14:39:03 +07:00

28 lines
1.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
description: Quick month-end spend projection from the daily trend
argument-hint: "[week|month]"
---
Give a quick spend projection for the end of the **$ARGUMENTS** period (`week` or
`month`; default `month` if empty).
1. Fetch the trend and current spend in parallel:
```
curl -s http://localhost:4820/api/analytics
curl -s http://localhost:4820/api/pricing/cost
```
From `/api/analytics` read `daily_sessions` (`[{ date, count }]`) and the session
total; from `/api/pricing/cost` read `total_cost`.
2. Project:
- `avg_cost_per_session = total_cost / total_session_count`.
- `avg_daily_spend = mean(last 7 days of daily_sessions[].count) × avg_cost_per_session`.
- `days_remaining` = days left until end of the chosen period (week → Sunday; month → last calendar day).
- `projected_total = total_cost + avg_daily_spend × days_remaining`.
3. Print: spend-to-date, `avg_daily_spend`, `days_remaining`, and the **projected end-of-period total** (USD, 4 decimals), with a ▲/▼ note on whether the 7-day pace is above or below the trailing 14-day pace.
State that daily spend is approximated from session counts. If the dashboard is
unreachable, tell the user to start it with `npm start` from the repo root. Keep it to
a few lines. Read-only — do not modify anything.